★ UK Manufactured  ·  35+ Years Experience  ·  Nationwide Installation

Factory Partitioning That Cuts Costs 40% and Installs in Days, Not Weeks

Durascreen® flexible partitioning divides warehouses and factories up to 35m+ tall, without expensive structural frameworks. The self-supporting design keeps costs consistent regardless of building height.

No obligation quote Response within 120 mins 35+ years experience, right first time
Durascreen® high-bay partition installed in UK manufacturing facility, completed in 4 days
Stolle Machinery - Machine Shop Segregation 9.5–11.5m height  ·  118.5m run  ·  Dust-tight, temperature-controlled
Durascreen® Factory Partitioning Installation Timelapse

Watch how Durascreen transforms factory spaces. Open floor to operational partition in days.

We've worked with
Aston Martin Biffa TNT Mercedes-Benz Weetabix
Free Site Survey + Energy Savings Analysis with Every Quote
We calculate exactly how much you could save before you commit to anything

"Our plans initially involved constructing a full building structure around the press, so when we shifted to a partition system, we thought we might be downgrading to a lesser-quality solution. However, this has been far from the case. We are extremely pleased with the quality and workmanship delivered by the DBC team. The system has allowed us to maximize the use of the area, and it integrates seamlessly with the rest of the factory while still providing the departmental separation and security we needed. A job very well done!"

Result: £111k saved  ·  24 days less downtime
Aaron Bowden
Managing Director, Westcolour

Why Factories Choose Durascreen®

With traditional construction, the taller the building, the more the price escalates. Durascreen is different.

1

The Same Price at 5m as 35m

Traditional partitioning needs heavier structural frameworks as height increases, so costs spiral. Durascreen's self-supporting design keeps costs nearly flat. A 35m installation costs only marginally more than a 5m one.

Typical saving: 40–60% vs rigid steel in tall buildings
2

100% Eliminates Cross-Contamination

Durascreen creates a complete dust barrier between production areas, sealing tightly around existing steelwork, pipework, and services. Sensitive processes stay clean, and dirty operations stay contained: without interrupting the flow of your factory.

Custom-sealed to eliminate dust migration between zones
3

Installed in 2–5 Days, Not Weeks

Prefabricated to your exact specifications. No welding, no concrete work, no prolonged site disruption. Most installations complete in days, with production running throughout.

Vs 2–3 weeks minimum for traditional construction
4

Built for Industrial Environments

Controls dust contamination, fumes, and draughts. Creates compliant clean zones, separates messy operations, or screens off building works while production continues.

Custom-fitted to seal around steelwork, pipework, and services

See the Difference

Real Durascreen installations across UK manufacturing and warehouse facilities.

Project 1 - Loudspeaker Technologies
Loudspeaker Technologies - before partition
Before
Loudspeaker Technologies - Durascreen partition installed
After: 4 Days

Dust-Tight Partition, Loudspeaker Technologies

9.3m height  ·  44m run  ·  Full dust segregation between manufacturing and storage

Choose Your Access Door

Every partition is fitted with the access door that suits your operation. With 35+ years of experience, we'll advise on the right choice during your free site survey. Door options include, but are not limited to, the following.

Pedestrian Door

Standard hinged door for regular foot traffic. Available in single or double leaf. Fitted with vision panel, self-closer, and anti-draught seals.

Most Popular

High Speed Door

Rapid-open roller door for forklift and vehicle traffic. Reduces heat loss from frequent access. Ideal for busy throughways in temperature-controlled zones.

For Forklift Access

Sliding Curtain Door

Flexible PVC strip curtain slides aside for wide access. Maintains thermal separation while allowing easy passage. Popular in food production and cold storage environments.

For Wide Access

PVC Strip Curtain

Fully clear strips with 100% overlap for a complete seal. Hands-free access for pedestrians and forklifts. Controls temperature, dust, noise, and pests.

Hands-Free Access

Not sure which door is right for your operation? We'll advise during your free site survey.

Durascreen® vs Traditional Construction

The key factors, side by side.

Factor Durascreen® Traditional Build
Installation time (50m run, 10m height) 4–5 days 2–3 weeks
Cost increase as height increases Minimal (~10% per metre) 100–150% increase
Thermal / energy performance Excellent, full seal Variable
Seals around existing steelwork & services Yes, custom manufactured Limited
Can be relocated or reconfigured Yes, fully relocatable No, permanent
Production disruption during installation Minimal Significant
Structural modifications required None Often required
UK manufactured, custom lead time 3–4 working days from sign-off Variable, typically 4–8 weeks

Our Simple 6-Step Process

From initial enquiry to a fully operational partition. We handle everything.

1

Free Consultation

Discuss your requirements with our team. We'll ask the right questions and advise on the best Durascreen solution for your facility.

2

Free Site Survey

We visit your premises, take precise measurements, and assess your exact requirements: ceiling height, steelwork, and any services to work around.

3

Quote

You receive a detailed fixed-price quotation and a design layout. Our quotation is the price you pay: no surprises.

4

Detailed Design

Review the layout, panel specification, door positions, and access options. We don't start manufacturing until you're completely happy.

5

UK Manufacturing

Your partition is custom-manufactured to exact specification at our UK facility. Lead time is typically 5–7 working days from sign-off.

6

Installation & Support

Our installation team completes the job in 2–5 days with minimal disruption. We clean up, test all door mechanisms, and provide ongoing aftercare.

Frequently Asked Questions

Everything you need to know about Durascreen flexible factory partitioning.

How long does installation actually take? +

Most Durascreen installations complete in 2–5 working days, depending on size and height. A typical 600m² partition at 5–6m height takes around 3 days. High-bay installations at 10m+ may take 4–5 days. We provide a specific timeline in your quotation. This compares to 2–3 weeks minimum for traditional construction of a comparable partition.

Can you partition around existing steelwork, pipework, and services? +

Yes. Every partition is manufactured to measure, creating a complete seal around existing pipework, cable trays, HVAC systems, and structural steelwork. We handle irregular building shapes and obstructions as standard. This is assessed and confirmed during your free site survey.

How much does factory partitioning cost? +

Costs vary based on height, linear run, door options, and specific requirements. Durascreen typically costs 40–60% less than rigid steel or blockwork partitioning for tall buildings, primarily because the self-supporting design eliminates expensive structural frameworks. For accurate pricing, request a free quote and we'll visit your site to provide a fixed-price figure.

What is the maximum height Durascreen can partition? +

Durascreen can effectively partition spaces to 35m+ in height. Unlike traditional partitioning where costs increase exponentially with height, our self-supporting system keeps cost increases minimal as height increases: approximately 10% per additional metre, versus 100–150% with conventional methods. This makes Durascreen a strong fit for high-bay warehouses and distribution centres.

Can the partition be moved or reconfigured in the future? +

Yes. Durascreen is designed to be fully relocatable. If your production layout changes, panels can be removed and reinstalled in a new configuration in a fraction of the time it would take to demolish and rebuild a traditional partition. That makes it a long-term asset rather than a fixed cost.

Tell Us About Your Project

Fill in your project details and we'll get back to you within 120 minutes to discuss next steps.

🚀
Fast response We'll be back in touch within 120 mins of your enquiry
💷
Fixed price, no surprises Our quotation is the price you pay
Completely no obligation A quote is just information. No pressure, no commitment.
🛡️
35+ years of installation expertise UK manufactured, installed by our own directly employed teams
Harrison Dunn, Technical Sales
Your enquiry goes directly to:
Harrison Dunn, Technical Sales
You'll hear back within 120 mins.
Get Your Free Quote + Site Survey
Takes 2 minutes  ·  No obligation  ·  UK team
📎
Click to upload or drag and drop
Floor plans, photos, drawings (JPG, PNG, PDF, max 10MB each)
No obligation Reply within 120 mins UK manufactured 35+ years experience

Engineered for Industrial Environments

35m+
Maximum Height
2–5
Days to Install
35+
Years Experience
40%
Up to Cost Saving vs Traditional Build
100%
Cross-Contamination Elimination
UK
Manufactured

Ready to Cut Costs and Install in Days?

Free site survey. Fixed-price quote. No obligation.

Get Free Quote + Site Survey → 📞 01767 601101

Response within 120 mins  ·  No obligation  ·  UK manufactured  ·  35+ years experience