Close-up of a Durascreen partition meeting the roofline

An infinitely flexible partitioning system

Made to measure in prefabricated sections, hung from your existing steelwork and sealed at the roofline. Fitted in days, and removed just as easily. Here is what one is made of.

A wall that seals the gap, and comes down again

Durascreen® is a reinforced flexible partition. It is made to measure in prefabricated sections that match the shape of your building, hung from the existing steelwork, and sealed around services and steelwork so dust, fumes and odours stay on one side.

Because it hangs rather than being built, it goes up in days instead of weeks, needs no foundations or blockwork, and the price barely changes as the building gets taller. Most installations are 2 to 5 days.

It also comes out again. Roll a panel up to move equipment through, move a wall when the layout changes, or take the whole thing down at the end of a lease and hand the building back as you found it.

A finished Durascreen partition wall inside an industrial building

What goes into a Durascreen® wall

Every Durascreen® is designed for one building, so these are the parts customers choose between. We will suggest others depending on what the space has to do.

Additional supporting steelwork

Additional supporting steelwork

Where a portal frame or purlin is not available to connect to, we install additional steelwork to suspend the Durascreen®.

'S' hooks over the building frame

'S' hooks over the building frame

Hooked over your existing steelwork, so there is no drilling into the building.

Dust-tight 'Vee' joining system

Dust-tight 'Vee' joining system

Panels connect with cleats and steel cables. This is what makes Durascreen® a sound choice for controlling dust, debris and odours.

High density foam inserts

High density foam inserts

Fill the gaps where the screen meets roof panels and walls, for a complete dust-tight seal.

A range of openings

A range of openings

Automated doors, curtains and shutters, so materials and large machinery can move through the screen.

Doors and fire escape doors

Doors and fire escape doors

Single skin or double skin insulated doors, chosen to suit the job.

Steel partition base

Steel partition base

Useful for mounting services onto the wall, or for extra resilience at floor level.

Neat, taut, printable finish

Neat, taut, printable finish

The finished wall is flat and taut, and your logo or message can be printed onto it in full colour.

Four jobs it does

Designed for dividing large, tall industrial buildings, where conventional partitioning gets expensive fast.

Dust, fumes and draughts

Contains airborne contamination and stops cross-contamination between working areas.

Screening off building works

A closed environment around the works, so production carries on unhindered, and the screen comes out again when the job is done.

Holding heat where it is needed

Thermal properties that suit containing warm or conditioned air, so you heat or cool one section of the building instead of all of it.

Privacy screening

Screening an area from view, which suits prototype and pre-production assembly.

Which fabric goes where

The grade is chosen for the job. These are the ones that appear across our case studies.

PX1000

The grade used on most jobs. Available in colours to match your building or branding, and in a translucent version that lets daylight through so the enclosed area needs no extra lighting.

PX520

Used where the wall is temporary, such as screening off an area during civil works.

CFG 402

A PU coated glass cloth, used where the specification calls for it.

Colours are chosen to match the building or your corporate colours. Clear PVC vision panels, roll-up sections and strip-curtain openings can be built into any of them.

Installed around you, not instead of you

Our own teams install, and they are used to working in live buildings: around production, at height, at weekends, or in stages while the rest of the site carries on.

  • 2 to 5 days on most jobs, longer on very large runs
  • No drilling into your steelwork, and no floor fixings needed
  • Pressure relief flaps on large screens, where air pressure differs across the wall
  • Heights from around 3m to 35m
  • Easily removed on completion of the works

Why customers choose it over a built wall

Stolle Machinery looked at building walls before choosing Durascreen®. Their reasons were cost first, flexibility second, and then the one that decided it:

"The really big factor is dilapidations. When we come to the end of our tenure in the building, we can easily take it out and put it back to standard."
Stolle Machinery UK

Want the detail for your building?

Fill in your project details and we'll get back to you within 120 minutes to discuss next steps.

🚀
Fast responseWe'll be back in touch within 120 mins of your enquiry
💷
Fixed price, no surprisesOur quotation is the price you pay
✅
Completely no obligationA quote is just information. No pressure, no commitment.
🛡️
35+ years of installation expertiseUK manufactured, installed by our own directly employed teams
Gareth Harvey, Technical Sales
Your enquiry goes directly to:
Gareth Harvey, Technical Sales
You'll hear back within 120 mins.*
* if submitted within business hours
Get Your Free Quote + Site Survey
Takes 2 minutes  ·  No obligation  ·  UK team
📎
Click to upload or drag and drop
Floor plans, photos, drawings (JPG, PNG, PDF, max 10MB each)
✓ No obligation✓ Reply within 120 mins✓ UK manufactured✓ 35+ years experience