Durascreen® in real factories and warehouses
Ten Durascreen® projects, from dust-tight walls in manufacturing to 185m of partitioning across a live warehouse.

Far quicker than any other warehouse walling system I know – the finished result also looks really neat.
Loudspeaker Technologies
Dusty manufacturing processes separated from finished-goods storage with a cost-effective, dust-tight wall.
9.3–11m high · 44m · 4 days
Read the case study →
Working with your team was absolutely excellent – genuinely faultless.
Stolle Machinery
The machine shop segregated inside a busy, multi-function workshop, for cleaner and more stable conditions.
9.5–11.5m high · 118.5m · 12 days
Read the case study →
It's now the coolest place in the factory, because it's so much easier to extract hot air.
Waddington Europe
Dust and excess heat from a plastic granulator contained, so it stopped affecting other processes in the factory.
6.2m high · 32.7m · 5 days
Read the case study →
We're very impressed with the wall! DBC have done a cracking job.
Marshalls
Dust from the batching process contained and kept out of nearby production areas, to improve working conditions for operatives.
10.6m high · 22.2m · 5 days
Read the case study →
While the rest of the factory was sometimes peaking at 34 degrees the cooled area stayed steady between 20 and 22.5 degrees.
Survitec Group
A contained manufacturing area so cooling systems could hold the temperatures MOD-compliant testing depends on.
15.6m high · 53m · 15 days
Read the case study →
Logistics & Fulfilment Centre, Coalville
Works carried out across six bays of a live warehouse, with staff kept safe and dust kept in the work area.
16.35m high · 185.6m · 3 weeks
Read the case study →
It was a smart, tidy job – tight finish, great colour. I absolutely recommend DBC.
Oakway Storage
Busy lorry loading separated from a clean, dry, near-airtight storage area to meet a major food ingredient contract.
11.4–13.8m high · 87m · 1 week
Read the case study →
The site installers were a pleasure to work with and we would definitely use DBC again.
Menzies Distribution
Two enclosures installed quickly around floor slab repairs inside a warehouse storing food products.
Up to 15m high · 79m + 67m perimeters · 10 days
Read the case study →
There aren't really any negatives, and we can't think of anything that needs improving.
Debach Enterprises
An area of the facility divided off to rent to a client for storage, while keeping the access the site needed.
9m high · 12m · 2 days
Read the case study →
Compared with some other companies we've worked with, DBC turned up when they said they would.
Rose Calendars
Partitioning fitted over three weekends, working around deliveries and the customer’s operational schedule.
4.3–5.8m high · 36.6m · 6 days over 3 weekends
Read the case study →Tell Us About Your Project
Fill in your project details and we'll get back to you within 120 minutes to discuss next steps.