
Case studies / Menzies Distribution
LogisticsMenzies Distribution
Two enclosures installed quickly around floor slab repairs inside a warehouse storing food products.
What Menzies Distribution needed
Menzies needed two enclosures installed at short notice around floor slab repairs, inside a warehouse used to store food products.
The solutionWhat we installed
Durascreen® flexible partitioning was recommended in PX1000 fabric.
- Our V-join system for a dust-tight seal between wall sections
- Foam infills between the partition and the roof panels, for a further dust-tight seal where the screen meets the roof
- PVC strip curtains in framed door openings, so dumpers and excavators can move in and out easily
- Roll-up panels with Velcro seams, for large openings when cement mixer trucks need access
The finished installation


I was involved at design stage through to site installation, the site installers were a pleasure to work with and we would definitely use DBC again and recommend them to anyone looking for this kind of service.
Other Durascreen® projects

Logistics & Fulfilment Centre, Coalville
Works carried out across six bays of a live warehouse, with staff kept safe and dust kept in the work area.
16.35m high · 185.6m · 3 weeks
Read the case study →
It was a smart, tidy job – tight finish, great colour. I absolutely recommend DBC.
Oakway Storage
Busy lorry loading separated from a clean, dry, near-airtight storage area to meet a major food ingredient contract.
11.4–13.8m high · 87m · 1 week
Read the case study →
There aren't really any negatives, and we can't think of anything that needs improving.
Debach Enterprises
An area of the facility divided off to rent to a client for storage, while keeping the access the site needed.
9m high · 12m · 2 days
Read the case study →Got a similar project?
Fill in your project details and we'll get back to you within 120 minutes to discuss next steps.

