Case studies / Debach Enterprises
Logistics, warehousing and storageDebach Enterprises
An area of the facility divided off to rent to a client for storage, while keeping the access the site needed.
What Debach Enterprises needed
Debach needed to separate areas of their facility, including dividing off a space to rent to one of their clients for storage, while keeping the access the site needed.
During the project their requirements changed, including one of the openings. The solution had to be flexible enough to take those changes without holding up the installation.
The solutionWhat we installed
Our Durascreen® flexible partitioning system was recommended, to provide the separation Debach needed while adapting to changes identified during installation.
- A bespoke partition designed around the site and how it operates
- An access opening built into the partition for movement between areas
- Opening specification adjusted mid-project to match a change the customer requested
- A flexible installation approach, so the revised requirement was fitted efficiently on site
- Installation rescheduled around a change to the original programme
The finished installation


The installation team was very helpful and accommodating throughout the project. When we needed to make a change to one of the openings, they were able to adapt quickly and get everything sorted efficiently.
Communication by email and throughout the project was excellent, and the installation was carried out professionally. The DBC team was flexible with the programme and worked around it with us, which was greatly appreciated.
Overall, we're very happy with how everything was handled. There aren't really any negatives, and we can't think of anything that needs improving.
Other Durascreen® projects

Logistics & Fulfilment Centre, Coalville
Works carried out across six bays of a live warehouse, with staff kept safe and dust kept in the work area.
16.35m high · 185.6m · 3 weeks
Read the case study →
It was a smart, tidy job – tight finish, great colour. I absolutely recommend DBC.
Oakway Storage
Busy lorry loading separated from a clean, dry, near-airtight storage area to meet a major food ingredient contract.
11.4–13.8m high · 87m · 1 week
Read the case study →
The site installers were a pleasure to work with and we would definitely use DBC again.
Menzies Distribution
Two enclosures installed quickly around floor slab repairs inside a warehouse storing food products.
Up to 15m high · 79m + 67m perimeters · 10 days