Durascreen partition installed at Rose Calendars

Case studies / Rose Calendars

Rose Calendars

Partitioning fitted over three weekends, working around deliveries and the customer’s operational schedule.

Installed in6 days over 3 weekends
Height4.3–5.8m
Length36.6m
SectorCommercial printing and corporate merchandise

What Rose Calendars needed

Rose Calendars needed partitioning in their facility that could be installed efficiently around their existing operations.

The project meant coordinating site access and deliveries around the customer's operational schedule. The partition had to be installed professionally, with minimal disruption, and meet the client's requirements.

What we installed

Our Durascreen® flexible partitioning system was installed to separate the facility, with the DBC team working closely with Rose Calendars throughout.

  • A bespoke Durascreen® system designed for the site
  • Installed over 3 consecutive weekends to fit around site access and keep disruption to a minimum
  • Two single-skin steel sliding doors with frames, for easy access through the partition
  • PVC windows for visibility and natural light

The finished installation

The installation went very smoothly from start to finish. Paul was excellent throughout and kept in regular contact with us before each weekend to ensure everything was arranged and the site was ready for him. The work was completed efficiently, professionally and on time.

What we particularly appreciated was the team's reliability. Compared with some other companies we've worked with, DBC turned up when they said they would, communicated well and got the work completed without any unnecessary disruption to our operations.

There was a minor adjustment needed to one of the doors after installation, and the team responded promptly, returned to site and resolved it quickly. We really appreciated how responsive and helpful they were, and the door is now working exactly as it should.

Overall, we've been extremely happy with the installation and the service we've received from DBC. The team has been professional, reliable and responsive throughout, and we'd be more than happy to recommend DBC to others or provide a reference.

Mark Shipley, Operations Director, Rose Calendars

Got a similar project?

Fill in your project details and we'll get back to you within 120 minutes to discuss next steps.

🚀
Fast responseWe'll be back in touch within 120 mins of your enquiry
💷
Fixed price, no surprisesOur quotation is the price you pay
✅
Completely no obligationA quote is just information. No pressure, no commitment.
🛡️
35+ years of installation expertiseUK manufactured, installed by our own directly employed teams
Gareth Harvey, Technical Sales
Your enquiry goes directly to:
Gareth Harvey, Technical Sales
You'll hear back within 120 mins.*
* if submitted within business hours
Get Your Free Quote + Site Survey
Takes 2 minutes  ·  No obligation  ·  UK team
📎
Click to upload or drag and drop
Floor plans, photos, drawings (JPG, PNG, PDF, max 10MB each)
✓ No obligation✓ Reply within 120 mins✓ UK manufactured✓ 35+ years experience