Case studies / Loudspeaker Technologies
ManufacturingLoudspeaker Technologies
Dusty manufacturing processes separated from finished-goods storage with a cost-effective, dust-tight wall.
What Loudspeaker Technologies needed
Loudspeaker Technologies needed to separate their manufacturing area, which included processes that produced dust, from the rest of their warehouse, where finished goods were stored. The finished goods could not be contaminated.
They were looking for a cost-effective, dust-tight wall.
The solutionWhat we installed
Durascreen® in PX1000 fabric was used to create a floor-to-ceiling wall in grey, to match the existing building.
- Two doorways, one for pedestrian access and one for moving materials
- PVC strip curtains over the doorways to contain dust, fumes and odours
- Durascreen®'s dust-tight V-join system
Same building, 4 days apart


We needed a dust wall to segregate our production space from goods storage as migration of dust between the two can be problematic for us, so I reached out to DBC, who were very helpful in coming down to measure up and help us to design a wall that met our criteria and budget. The design and install process went well and is far quicker than any other warehouse walling system I know – the finished result also looks really neat.
Other Durascreen® projects

Working with your team was absolutely excellent – genuinely faultless.
Stolle Machinery
The machine shop segregated inside a busy, multi-function workshop, for cleaner and more stable conditions.
9.5–11.5m high · 118.5m · 12 days
Read the case study →
It's now the coolest place in the factory, because it's so much easier to extract hot air.
Waddington Europe
Dust and excess heat from a plastic granulator contained, so it stopped affecting other processes in the factory.
6.2m high · 32.7m · 5 days
Read the case study →
We're very impressed with the wall! DBC have done a cracking job.
Marshalls
Dust from the batching process contained and kept out of nearby production areas, to improve working conditions for operatives.
10.6m high · 22.2m · 5 days
Read the case study →Got a similar project?
Fill in your project details and we'll get back to you within 120 minutes to discuss next steps.