
Case studies / Waddington Europe
Food packaging manufacturingWaddington Europe
Dust and excess heat from a plastic granulator contained, so it stopped affecting other processes in the factory.
What Waddington Europe needed
Waddington Europe needed to contain the dust and heat generated by an additional plastic granulator machine. The excess heat was affecting other processes in their factory.
The solutionWhat we installed
Durascreen® in PX1000 fabric was recommended to contain the dust and help the cooling system in the area work more effectively.
- A roll-up panel for occasional use and for maintenance involving large plant and machinery
- Translucent PX1000 for a durable, long-lasting partition that lets light through, so the area needs no extra lighting
- Clear vision panels for a line of sight into the granulator area
- A PVC strip curtain opening to contain dust while forklifts and other equipment move freely in and out
The finished installation


Having enclosed the area surrounding the granulating machine, it's now the coolest place in the factory, because it's so much easier to extract hot air.
I couldn't fault your team in terms of service and accessibility. It went really well, and I would certainly recommend you.
Other Durascreen® projects

Far quicker than any other warehouse walling system I know – the finished result also looks really neat.
Loudspeaker Technologies
Dusty manufacturing processes separated from finished-goods storage with a cost-effective, dust-tight wall.
9.3–11m high · 44m · 4 days
Read the case study →
Working with your team was absolutely excellent – genuinely faultless.
Stolle Machinery
The machine shop segregated inside a busy, multi-function workshop, for cleaner and more stable conditions.
9.5–11.5m high · 118.5m · 12 days
Read the case study →
We're very impressed with the wall! DBC have done a cracking job.
Marshalls
Dust from the batching process contained and kept out of nearby production areas, to improve working conditions for operatives.
10.6m high · 22.2m · 5 days
Read the case study →Got a similar project?
Fill in your project details and we'll get back to you within 120 minutes to discuss next steps.

