
Case studies / Marshalls
Construction materialsMarshalls
Dust from the batching process contained and kept out of nearby production areas, to improve working conditions for operatives.
What Marshalls needed
Marshalls needed to contain dust from their batching process and stop it spreading to nearby production areas. The dust posed no health risk, but controlling it was essential to improve working conditions for operatives.
The solution needed to be effective, designed for the site, and installed without affecting daily production.
The solutionWhat we installed
Durascreen® in PX1000 fabric was recommended to contain the dust.
- Dust-tight V-overlap joins to reduce airborne dust moving between the batching and production zones
- PVC strip curtains at access points, so operatives and equipment move easily while dust stays contained
- A bespoke fabric wall designed around the batching area
- A roll-up panel with Velcro edges and webbing straps, for occasionally moving larger equipment in and out
- Clear PVC vision panels welded into the wall
The finished installation

We're very impressed with the wall! DBC have done a cracking job. It's been great working with them, and I genuinely appreciate all the assistance throughout the process. They've been excellent to work with, and I wouldn't hesitate to recommend them for any future dust barrier or curtain requirements.
Other Durascreen® projects

Far quicker than any other warehouse walling system I know – the finished result also looks really neat.
Loudspeaker Technologies
Dusty manufacturing processes separated from finished-goods storage with a cost-effective, dust-tight wall.
9.3–11m high · 44m · 4 days
Read the case study →
Working with your team was absolutely excellent – genuinely faultless.
Stolle Machinery
The machine shop segregated inside a busy, multi-function workshop, for cleaner and more stable conditions.
9.5–11.5m high · 118.5m · 12 days
Read the case study →
It's now the coolest place in the factory, because it's so much easier to extract hot air.
Waddington Europe
Dust and excess heat from a plastic granulator contained, so it stopped affecting other processes in the factory.
6.2m high · 32.7m · 5 days
Read the case study →Got a similar project?
Fill in your project details and we'll get back to you within 120 minutes to discuss next steps.

